Contact us
Add: Benjia Ji, Northern Suburb of Hai'an County, Nantong City, Jiangsu Province, China
Tel: +86-513-88755311
+86-513-88755027
Fax: +86-513-88755315
E-mail: dcf@pengfei.com.cn
Tel: +86-513-88755311
+86-513-88755027
Fax: +86-513-88755315
E-mail: dcf@pengfei.com.cn
Home > Products > The general introduction of the technology used in the slag powder/steel slag powder production line with annual capacit
The general introduction of the technology used in the slag powder/steel slag powder production line with annual capacit
The storage and transport of the wet slag/steel slag: the wet slag/steel slag is transported to factory by truck and storage hall through discharge hopper and belt conveyor. Re-taken away by the forklift, the material is conveyed to slag/steel slag vertical mill directly via belt conveyor after weighed by constant feeder. To remove iron, an electric magnetic iron remover device is installed on belt conveyor.The grinding and storage of the slag/steel slag: the wet slag/steel slag is transported to the inlet of vertical roller mill by belt conveyor after measured the weight by constant feeder. After dried and ground, the slag powder/steel slag power/steel slag power is conveyed to silos by aerated conveying though and elevator after collected by pulse-jet bag dust collector. The discharged waste slag will be re-fed to the vertical roller mill again via belt conveyor and bucket elevator. An electric magnetic iron remover is installed on waste slag belt conveyor for iron removal. The emission concentration of the air box pulse bag type dust collector is less than 20mg/Nm3. The heat source, used for grinding and drying, is provided by the coal fired hot air furnace that set in front of the vertical roller mill.
Jiangsu Pengfei Group is equipped with advanced technology and can meet the requirements of 1 million tons mineral powder production line.
We can also provide sets of equipment and technical service. The system electric consumption is no more than 40Kwh/t and it meets the environmental emission standards.
The advantages of slag power/steel slag power production lines
- Considerable investment returns, 1-2years payback period
- High productivity and energy efficiency
Related products
- The general introduction of the technology used in the slag powder/steel slag powder production line with annual capacit The storage and transport of the wet slag/steel slag: the wet slag/steel slag is transported to factory by truck and storage hall through discharge hopper and belt conveyor. Re-taken away by ...
- New Type Dry Process Cement Production Line Description of New Type Dry Process Cement Production Line: This new type dry process cement production line is a kind of process mainly used for small, medium and large-scale cement plants. ...
Cement Grinding Plant Cement Production Line Industrial Kiln and Furnace Grinding Equipment Crushing Equipment Environmental Protection Equipment Cooling Equipment Drying Equipment Compound Fertilizer Equipment Conveying Lifting Packing Equipment Chemical Equipment Electrical Control System Contact Us